Cost and Time

    DIFC as Default Seat: Reading DIAC's 2024 Seat, Law and Language Statistics

    DIFC was the seat in 48% of DIAC arbitrations registered in 2024 and is the default seat under the DIAC Rules 2022. What that means for expert evidence in Dubai construction disputes.

    By Garry Andrews3 min read
    • DIAC
    • arbitrateAD
    • SCCA
    • QICCA
    • BCDR
    • DIFC Courts
    • ADGM Courts
    • QICDRC
    • BICC

    One of the most consequential changes introduced by the DIAC Arbitration Rules 2022 is the default seat. Under Article 20.1, where the parties have not agreed a seat, the initial seat of the arbitration is the DIFC. DIAC's 2024 statistics show how that plays out in practice.

    Of the 262 arbitrations registered in 2024, Dubai (outside the DIFC) was the seat in 135 cases (51%) and the DIFC was the seat in 126 cases (48%), with Abu Dhabi and Istanbul taking one case each. The DIFC figure includes cases where the seat had not yet been determined by the tribunal and therefore defaulted to the DIFC under the Rules.

    Why the Seat Changes the Expert's Working Environment

    The seat determines the curial law governing the arbitration and the supervisory court. A DIFC-seated arbitration sits under DIFC arbitration law with the DIFC Courts โ€” a common-law jurisdiction operating in English โ€” exercising supervisory jurisdiction.

    For expert witnesses this is not an abstraction. The seat influences expectations around the expert's duty of independence, the form and structure of reports, how disclosure and document production are handled, and the conduct of cross-examination. Experts accustomed to common-law procedure in the DIFC will find a familiar rhythm; those appearing in matters seated in Dubai (outside the DIFC) need to be alert to a different procedural culture, even where the DIAC Rules provide the immediate framework.

    Governing Law: Not Always UAE Law

    The laws of Dubai and the UAE remained the most common contractual choice of law in 2024, but the laws of England and Wales applied in 39 cases (15%), and Saudi law rose to 10 cases (3.8%) from 1.5% the previous year. Governing law shapes core quantum and delay questions โ€” the recoverability of loss of profit, the treatment of concurrent delay, the enforceability of liquidated damages and caps, and the operation of good faith obligations under the UAE Civil Code all vary by system.

    An expert should be instructed clearly on the legal assumptions to apply. Where those assumptions are contested, the report should state them expressly rather than absorbing them silently into the analysis.

    Language: English Dominates

    English was the language of the arbitration in 248 cases (95%), Arabic in 13 (5%), and both in one. Appointing authority cases ran the other way, with Arabic used in 64%. For construction disputes, English-language proceedings remain overwhelmingly the norm, but project records frequently include Arabic-language correspondence, permits and municipality approvals. Experts should confirm early how translated documents will be handled and who bears responsibility for translation accuracy โ€” disputes about the meaning of a translated instruction can consume disproportionate hearing time.

    Legacy Arbitration Agreements

    DIAC also reports that 26% of 2024 cases were brought on the basis of legacy arbitration agreements naming a dissolved Dubai centre, down from 32%, alongside 8% under DCCI clauses and one EMAC case. Legacy clauses from contracts signed before the 2021 restructuring continue to feed the Centre's caseload, and jurisdictional objections around them remain live โ€” 16 preliminary jurisdictional objections were filed in 2024.

    Practical Guidance

    Check the seat before scoping expert work, not after. Confirm the governing law assumptions in writing in the expert's instructions. Plan translation logistics early where the record is bilingual. And on older contracts, review the arbitration clause carefully โ€” a clause naming a superseded institution does not necessarily prevent DIAC administering the dispute, but it does change the procedural runway.

    We provide construction expert witness evidence in both DIFC-seated and Dubai-seated arbitrations, and before the DIFC Courts, tailoring report format and delivery to the forum.

    Frequently asked questions

    Sources & further reading

    Who we work with

    For lawyers and in-house counsel

    Independent, tribunal-ready evidence that maps to the pleadings and the list of issues, with early sight of evidential gaps.

    Discuss an instruction

    For contractors and engineering firms

    Understand what a claim is really worth before you commit โ€” and independent evidence that stands up to scrutiny if it proceeds.

    Talk to us about a claim

    For private clients and developers

    Plain-language advice on where the real exposure lies, and a clear basis for settlement or the next stage of the dispute.

    Arrange a confidential call

    Need a construction expert witness?

    Tell us about the dispute, the forum and the timetable. We'll complete a conflict check and come back to you promptly.

    Discuss an instruction

    Please do not send confidential documents until a conflict check has been completed.