    The IBA Rules on the Taking of Evidence in International Arbitration, most recently revised in 2020, are the closest thing international construction arbitration has to a common evidentiary rulebook.

    By Garry Andrews2 min read
    • DIAC
    • arbitrateAD
    • SCCA
    • QICCA
    • BCDR
    • DIFC Courts
    • ADGM Courts
    • QICDRC
    • BICC

    The IBA Rules on the Taking of Evidence in International Arbitration, most recently revised in 2020, are the closest thing international construction arbitration has to a common evidentiary rulebook. They are rarely adopted wholesale as binding rules; more often, tribunals refer to them as guidance, or the parties agree to apply them "by analogy." For construction disputes specifically, several provisions carry outsized practical weight.

    Article 3: Document Production and the Redfern Schedule

    Article 3 governs requests to produce, structured through the now-standard Redfern Schedule format: the document or category sought, its relevance and materiality to the case, and the requesting party's statement that it does not already possess the documents. In construction disputes, well-drafted Article 3 requests are typically organised around the delay analysis or quantum methodology being deployed โ€” for example, requesting the as-built programme updates, site diaries, or resource records for a specific, identified period of critical path activity, rather than broad, undated categories that invite a proportionality objection.

    Article 5: Party-Appointed Experts

    Article 5 sets out the content requirements for a party-appointed expert report: qualifications, instructions received, a description of the methodology applied, the opinions reached and the facts on which they are based, and โ€” critically for construction experts โ€” an affirmation of genuinely held belief in the opinions expressed. The 2020 revisions reinforced the independence expectation, a point of particular relevance to delay and quantum experts who are frequently engaged by the same law firm across multiple matters and must be able to demonstrate, on the face of the report, that the analysis was conducted independently of counsel's preferred outcome.

    Article 6: Tribunal-Appointed Experts

    Article 6 provides for tribunal-appointed experts, a mechanism used more frequently in civil law-influenced or Prague Rules-influenced procedures, and increasingly considered in complex technical or structural disputes where the tribunal itself lacks the specialist background to evaluate competing party experts without independent input. For structural and geotechnical disputes in particular, a tribunal-appointed expert can narrow the scope of what needs to be contested between the party experts.

    Article 9: Admissibility, Materiality, and Legal Privilege

    Article 9 gives the tribunal broad discretion to exclude evidence on grounds of relevance, proportionality, legal privilege, or commercial or technical confidentiality โ€” a provision with particular bite in construction disputes involving proprietary design methodologies, third-party subcontractor pricing, or sensitive government project data.

    Applying the IBA Rules in DIAC-Seated Construction Arbitration

    DIAC's own Arbitration Rules do not mandate the IBA Rules, but in practice the overwhelming majority of DIAC tribunals in construction matters adopt IBA Rules principles either by express agreement recorded in Procedural Order No. 1, or through the tribunal's general case management discretion. For construction experts and the counsel instructing them, this means treating the IBA Rules' Article 5 content requirements as the practical minimum standard for a defensible report โ€” regardless of whether the tribunal has formally adopted the Rules โ€” since a report that would not satisfy Article 5 is unlikely to withstand scrutiny at cross-examination in any event.

    Who we work with

    For lawyers and in-house counsel

    Independent, tribunal-ready evidence that maps to the pleadings and the list of issues, with early sight of evidential gaps.

    Discuss an instruction

    For contractors and engineering firms

    Understand what a claim is really worth before you commit โ€” and independent evidence that stands up to scrutiny if it proceeds.

    Talk to us about a claim

    For private clients and developers

    Plain-language advice on where the real exposure lies, and a clear basis for settlement or the next stage of the dispute.

    Arrange a confidential call

    Need a construction expert witness?

    Tell us about the dispute, the forum and the timetable. We'll complete a conflict check and come back to you promptly.

    Discuss an instruction

    Please do not send confidential documents until a conflict check has been completed.