    Common Law and Civil Law Approaches to Construction Evidence in DIAC and DIFC-Seated Arbitrations

    International construction arbitration is, by design, a meeting point of legal traditions.

    By Garry Andrews3 min read
    • DIAC
    • arbitrateAD
    • SCCA
    • QICCA
    • BCDR
    • DIFC Courts
    • ADGM Courts
    • QICDRC
    • BICC

    International construction arbitration is, by design, a meeting point of legal traditions. A DIAC tribunal seated in Dubai may comprise a common law-trained chair, a civil law-trained co-arbitrator, and counsel drawn from both traditions representing an employer and a contractor headquartered in yet different jurisdictions. Understanding how these traditions diverge on the taking of evidence โ€” and how that divergence is increasingly bridged in practice โ€” is essential to running an efficient and persuasive construction case.

    Document Production: A Point of Genuine Divergence

    The clearest fault line lies in document disclosure. Common law practitioners tend to arrive expecting a disclosure phase resembling, even in attenuated form, the discovery process familiar from litigation โ€” broad categories of documents, met with resistance, refined through a Redfern Schedule. Civil law practitioners, by contrast, are often trained in a tradition where each party proves its own case from documents already in its possession, and where compelled production of an opponent's documents is the exception rather than the norm. In a construction dispute, this matters enormously: delay and disruption claims frequently depend on internal contemporaneous records โ€” daily diaries, resource allocation sheets, internal correspondence โ€” that only the opposing party holds. A tribunal's approach to document production requests can materially determine whether such evidence ever reaches the record.

    Witness and Expert Evidence: Converging Practice

    Civil law systems traditionally place less weight on witness testimony generally, and treat party-appointed experts with more institutional suspicion than common law systems, which have developed detailed procedural machinery โ€” cross-examination, expert conferencing, Daubert-style scrutiny in some jurisdictions โ€” for testing expert opinion. In construction arbitration, however, practice has substantially converged: written witness statements and written expert reports, exchanged in advance and tested through structured cross-examination or tribunal-led questioning at a hearing, are now close to universal regardless of the arbitrators' legal training. The IBA Rules on the Taking of Evidence have been a significant driver of this convergence, offering a hybrid procedure deliberately designed to be acceptable to both traditions.

    Standard of Proof

    Civil law and common law jurisdictions also differ, at a conceptual level, in how they articulate the standard of proof applicable to disputed facts โ€” a question addressed in more detail later in this series in the specific context of quantum evidence. For construction disputes, where causation questions (was a particular delay event critical to completion; did a particular design deficiency cause a particular defect) are rarely susceptible of certainty, the tribunal's approach to weighing competing expert narratives against a stated standard of proof has a direct bearing on outcome.

    Practical Implications for UAE-Seated Construction Arbitration

    DIAC tribunals, drawing on a genuinely international pool of arbitrators, generally adopt a pragmatic middle path: some document production consistent with IBA Rules principles, written witness and expert evidence tested at an oral hearing, and cost-conscious case management reflecting Prague Rules-influenced efficiency thinking without abandoning common law-style evidentiary testing altogether. For parties and their experts, the practical lesson is not to assume either a common law or a civil law approach by default, but to establish the tribunal's evidentiary preferences early โ€” ideally at the first case management conference โ€” and to tailor the scope and format of expert evidence accordingly, particularly given how directly this affects the cost and timeline issues explored elsewhere in this series.

    Who we work with

    For lawyers and in-house counsel

    Independent, tribunal-ready evidence that maps to the pleadings and the list of issues, with early sight of evidential gaps.

    Discuss an instruction

    For contractors and engineering firms

    Understand what a claim is really worth before you commit โ€” and independent evidence that stands up to scrutiny if it proceeds.

    Talk to us about a claim

    For private clients and developers

    Plain-language advice on where the real exposure lies, and a clear basis for settlement or the next stage of the dispute.

    Arrange a confidential call

    Need a construction expert witness?

    Tell us about the dispute, the forum and the timetable. We'll complete a conflict check and come back to you promptly.

    Discuss an instruction

    Please do not send confidential documents until a conflict check has been completed.