    Taking Evidence from State and Government Entities in UAE Construction Disputes

    A substantial share of major infrastructure, energy, and transport projects in the UAE and the wider GCC involve a government entity, state-owned enterprise, or government-linked developer as employer.

    By Garry Andrews2 min read
    • DIAC
    • arbitrateAD
    • SCCA
    • QICCA
    • BCDR
    • DIFC Courts
    • ADGM Courts
    • QICDRC
    • BICC

    A substantial share of major infrastructure, energy, and transport projects in the UAE and the wider GCC involve a government entity, state-owned enterprise, or government-linked developer as employer. Construction disputes involving such counterparties present distinct evidentiary dynamics that private-sector counterparts do not.

    Asymmetries in Access to Information

    State and government-linked employers frequently retain internal decision-making records โ€” cabinet or board approvals, internal budget and funding decisions, inter-departmental correspondence concerning a project โ€” that are structurally more difficult for a contractor counterparty to access than an equivalent private-sector employer's internal records would be, given the additional layers of institutional confidentiality that can attach to government decision-making. Tribunals are increasingly attentive to this asymmetry when ruling on document production requests directed at a state party, and a well-framed request explaining why specific internal records are necessary to test a specific factual assertion the state party has itself put in issue is more likely to succeed than a broad request for internal government correspondence generally.

    State Immunity and Its Limited Relevance to Evidence-Taking

    While sovereign or state immunity doctrines are principally relevant to enforcement of an award against state assets, related considerations of institutional sensitivity sometimes surface at the evidence-taking stage, where a state party resists producing records on grounds of national security, procurement confidentiality, or similar public interest grounds. Tribunals typically require the state party to substantiate such objections with specificity rather than accepting a generalised assertion of sensitivity, and may consider redaction, confidentiality rings limited to counsel and experts, or in camera review as proportionate alternatives to outright refusal.

    Officials as Witnesses

    Government project representatives called as factual witnesses in a construction arbitration sometimes face institutional constraints โ€” internal approval requirements before giving evidence, or a more limited personal recollection where decision-making was genuinely collective โ€” that differ from the position of a private-sector witness. Counsel should account for these constraints in witness preparation timelines, particularly where internal government approval processes for permitting an official to testify can themselves take considerable time.

    Leaked or Improperly Obtained Evidence Involving State Parties

    Construction disputes involving state or government-linked employers occasionally raise questions about the admissibility of leaked internal government documents or communications obtained outside the formal disclosure process. As with the general principles discussed earlier in this series, tribunals retain discretion to weigh the probative value of such evidence against the manner in which it was obtained, a balancing exercise that takes on particular sensitivity where the material concerns a government counterparty's internal deliberations.

    Practical Recommendations

    Parties in dispute with a state or government-linked entity should build realistic time into the procedural timetable for the state party's internal approval processes around both document production and witness availability, frame document requests with precision to reduce the likelihood of a broad confidentiality objection, and consider proposing confidentiality protections โ€” redaction protocols or restricted-access document rings โ€” proactively rather than waiting for a dispute over production to arise.

    ---

    This article is provided for general informational purposes and does not constitute legal advice.

    Who we work with

    For lawyers and in-house counsel

    Independent, tribunal-ready evidence that maps to the pleadings and the list of issues, with early sight of evidential gaps.

    Discuss an instruction

    For contractors and engineering firms

    Understand what a claim is really worth before you commit โ€” and independent evidence that stands up to scrutiny if it proceeds.

    Talk to us about a claim

    For private clients and developers

    Plain-language advice on where the real exposure lies, and a clear basis for settlement or the next stage of the dispute.

    Arrange a confidential call

    Need a construction expert witness?

    Tell us about the dispute, the forum and the timetable. We'll complete a conflict check and come back to you promptly.

    Discuss an instruction

    Please do not send confidential documents until a conflict check has been completed.