    Planning an Efficient Evidentiary Procedure for Complex Construction Arbitrations

    The single procedural decision with the greatest influence on the cost and duration of a construction arbitration is not made at the hearing โ€” it is made at the first case management conference, when the tribunal and parties agree the...

    By Garry Andrews2 min read
    • DIAC
    • arbitrateAD
    • SCCA
    • QICCA
    • BCDR
    • DIFC Courts
    • ADGM Courts
    • QICDRC
    • BICC

    The single procedural decision with the greatest influence on the cost and duration of a construction arbitration is not made at the hearing โ€” it is made at the first case management conference, when the tribunal and parties agree the framework for document production, witness and expert evidence, and hearing structure. Getting this framework right, tailored to the specific evidentiary demands of a construction dispute, pays dividends throughout the case.

    Sequencing Document Production Around the Technical Case

    Rather than treating document production as a generic phase preceding witness statements, an efficient construction procedure sequences it around the specific delay, disruption, or quantum methodology the experts will apply. If a delay expert intends to run a time-impact analysis keyed to specific programme revisions, the document production phase should be scoped to secure those revisions and their supporting records before the expert's analysis is finalised โ€” not after, when late-produced documents risk requiring a costly re-analysis.

    Bifurcation and Phased Procedures

    For disputes combining liability, causation, and quantum issues, bifurcation โ€” resolving liability first, with quantum evidence deferred pending the outcome โ€” can avoid the cost of a full quantum expert exercise on claims that may not survive a liability determination. This is a particularly relevant tool in construction disputes involving multiple, discrete claim heads (variations, delay, defects, prolongation) where liability findings on some heads may resolve or substantially narrow the case before quantum evidence needs to be finalised on all of them.

    Structuring Expert Evidence Exchange

    A well-planned procedural timetable typically provides for simultaneous or sequential exchange of expert reports (simultaneous exchange is more common where independence is a live concern), followed by a joint expert conferencing process producing a joint statement identifying agreed and disputed issues, and only then proceeding to a hearing focused specifically on the matters the joint statement identifies as genuinely contested. This sequencing โ€” increasingly standard in DIAC construction references โ€” prevents hearing time being spent on issues the experts in fact agree upon.

    Managing Multiple Expert Disciplines in Parallel

    Complex construction disputes frequently require delay, quantum, and technical (structural, geotechnical, or MEP) experts to work in parallel, with each discipline's conclusions feeding into the others โ€” a quantum expert's prolongation costs calculation, for example, depends on the delay expert's critical path findings. The procedural timetable should account for this interdependency explicitly, sequencing report exchange so that quantum reports can properly incorporate delay findings rather than being prepared on a provisional or assumed basis that then requires revision.

    Setting Realistic Hearing Time

    Construction hearings are frequently under-timetabled relative to the volume of expert evidence involved. Agreeing hearing time allocation per witness and expert at the procedural order stage โ€” informed by a realistic view of how many issues genuinely require oral testing after the joint statement process โ€” reduces the risk of a rushed, compressed hearing that limits the tribunal's ability to properly test competing expert evidence on technically dense issues.

    Who we work with

    For lawyers and in-house counsel

    Independent, tribunal-ready evidence that maps to the pleadings and the list of issues, with early sight of evidential gaps.

    Discuss an instruction

    For contractors and engineering firms

    Understand what a claim is really worth before you commit โ€” and independent evidence that stands up to scrutiny if it proceeds.

    Talk to us about a claim

    For private clients and developers

    Plain-language advice on where the real exposure lies, and a clear basis for settlement or the next stage of the dispute.

    Arrange a confidential call

    Need a construction expert witness?

    Tell us about the dispute, the forum and the timetable. We'll complete a conflict check and come back to you promptly.

    Discuss an instruction

    Please do not send confidential documents until a conflict check has been completed.