    How to Investigate Building Defects: A Practical Framework

    A structured approach to defect investigation in the GCC climate, from initial inspection and testing through to root cause analysis and remedial cost.

    By Garry Andrews1 min read
    • DIAC
    • arbitrateAD
    • SCCA
    • QICCA
    • BCDR
    • DIFC Courts
    • ADGM Courts
    • QICDRC
    • BICC

    Defect disputes turn on causation. A structured investigation makes the difference between an opinion that persuades and one that is dismissed as assertion.

    Define the scope before attending site

    Establish what is alleged, where, and since when. Obtain the design drawings, specification, as-built information, material approvals, inspection and test plans, handover documents and maintenance records.

    Conduct a staged inspection

    Stage one: visual and non-destructive

    Record conditions systematically by location with photographs, moisture readings, thermography, cover meter surveys and crack mapping. Establish the pattern and distribution of the defect.

    Stage two: opening up and testing

    Agree an opening-up protocol with the parties, including notice, joint attendance and reinstatement. Sample and test to recognised standards, and preserve samples with a documented chain of custody.

    Analyse the root cause

    Distinguish between design inadequacy, non-compliant materials, defective workmanship, inadequate maintenance and normal wear. In the GCC, consider the specific drivers of failure: sustained high temperatures, high humidity and salt-laden air, chloride and sulphate attack on concrete, thermal cycling of facades and roofing, and water ingress at interfaces.

    Establish compliance

    Compare what was built against the contract specification and the applicable codes and authority requirements. Non-compliance and defect are related but not identical, and the distinction matters to liability.

    Assess the remedy and its cost

    Identify the reasonable scheme of repair, not the most expensive one. Consider betterment, temporary works, decanting and business interruption, and confirm whether the remedy must address the cause or only the symptom to be effective over the design life.

    Report so it can be tested

    Set out the facts observed, the tests performed and their results, the opinions reached, the reasoning connecting the two, and any matters on which further information would change the conclusion.

    Who we work with

    For lawyers and in-house counsel

    Independent, tribunal-ready evidence that maps to the pleadings and the list of issues, with early sight of evidential gaps.

    Discuss an instruction

    For contractors and engineering firms

    Understand what a claim is really worth before you commit โ€” and independent evidence that stands up to scrutiny if it proceeds.

    Talk to us about a claim

    For private clients and developers

    Plain-language advice on where the real exposure lies, and a clear basis for settlement or the next stage of the dispute.

    Arrange a confidential call

    Need a construction expert witness?

    Tell us about the dispute, the forum and the timetable. We'll complete a conflict check and come back to you promptly.

    Discuss an instruction

    Please do not send confidential documents until a conflict check has been completed.