Instructing the right expert, in the right way, at the right time is one of the most effective things a legal team can do to strengthen a construction dispute. This guide covers the practical mechanics.
Decide what expertise you actually need
Construction expert evidence is not a single discipline. Typical appointments include quantum experts, delay experts, building pathology and defects experts, structural engineers, and materials specialists. Complex matters often require more than one, with a clear division of scope so the reports do not overlap or contradict.
Test independence and availability
Check for conflicts against all parties, related entities and the professional team. Confirm the expert has genuine capacity for the timetable, including hearing dates, and that the person named will do the work rather than delegate it.
Write a clear letter of instruction
- State the parties, the forum and the applicable rules.
- Set out the factual background succinctly and neutrally.
- List the specific questions the expert is asked to answer.
- Identify the documents provided and how further documents will be requested.
- Confirm the expert's overriding duty to the tribunal or court.
- Set the timetable, including dates for a draft, joint discussions and the signed report.
Understand the expert's duties
Whether the matter proceeds in arbitration under institutional rules or before the DIFC Courts, expert evidence is opinion evidence given for the benefit of the tribunal. The expert must state the facts and assumptions relied upon, distinguish fact from opinion, identify matters outside their expertise, and correct any opinion that changes.
Manage the process
Provide documents in a structured, indexed form. Allow time for site inspection where relevant. Expect joint expert meetings and a joint statement identifying areas of agreement and disagreement โ this is often where cases narrow substantially.
Agree fees and terms in advance
Fee arrangements should be transparent and never contingent on the outcome. Agree hourly rates or fixed stages, an estimate for each phase, and terms for hearing attendance and cancellation.