Pillar guide

    How to Choose Between Arbitration and Litigation in the UAE

    A comparison of DIAC arbitration and DIFC Courts litigation, with the practical factors that drive the choice of forum in construction disputes.

    By Stuart Andrews1 min read
    • DIAC
    • arbitrateAD
    • SCCA
    • QICCA
    • BCDR
    • DIFC Courts
    • ADGM Courts
    • QICDRC
    • BICC

    The forum shapes everything that follows: the timetable, the cost, how expert evidence is handled, and how a decision is enforced. This guide compares the main routes for construction disputes in the UAE.

    Arbitration under DIAC

    The Dubai International Arbitration Centre administers arbitration under its 2022 Rules. Proceedings are private, the parties participate in constituting the tribunal, and awards are enforceable internationally under the New York Convention. Costs are governed by DIAC's published table of fees, with an advance on costs payable by the parties.

    Litigation in the DIFC Courts

    The DIFC Courts apply a common law procedure in English. Expert evidence is governed by Part 31 of the Rules of the DIFC Courts, which requires permission to call an expert, imposes an overriding duty to the Court, and provides for Court-appointed experts, joint statements and concurrent evidence.

    Proceedings are conducted in Arabic, with the Court typically appointing its own experts whose reports carry substantial weight. Party expert input is often channelled through submissions to the Court-appointed expert.

    The factors that usually decide it

    • Confidentiality. Arbitration is private; court proceedings generally are not.
    • Technical complexity. A tribunal with construction experience can absorb technical evidence quickly.
    • Speed and cost. Neither route is inherently cheaper; the scale of the dispute and the number of expert disciplines drive both.
    • Enforcement. Consider where the counterparty's assets sit before choosing.
    • Interim relief. Check what the forum can grant and how quickly.

    Practical advice

    Most parties inherit their forum from the contract, so the time to make this decision is at drafting. Where a multi-tier clause requires amicable settlement or mediation first, comply with each step โ€” failure to do so can derail a claim on jurisdiction before the merits are reached.

    Sources & further reading

    Who we work with

    For lawyers and in-house counsel

    Independent, tribunal-ready evidence that maps to the pleadings and the list of issues, with early sight of evidential gaps.

    Discuss an instruction

    For contractors and engineering firms

    Understand what a claim is really worth before you commit โ€” and independent evidence that stands up to scrutiny if it proceeds.

    Talk to us about a claim

    For private clients and developers

    Plain-language advice on where the real exposure lies, and a clear basis for settlement or the next stage of the dispute.

    Arrange a confidential call

    Need a construction expert witness?

    Tell us about the dispute, the forum and the timetable. We'll complete a conflict check and come back to you promptly.

    Discuss an instruction

    Please do not send confidential documents until a conflict check has been completed.